Sanitary container
Sanitary and changing-room layouts selected for the project requirements.
Scope and price confirmed in the individual offer

Configuration overview
Configuration, scope and price are confirmed in your offer.
Configuration options
- Room layout options
- Window and door options
- Electrical plan options
- Heating and cooling options
- Insulation options
- Interior finish options
Additional options
- Facade options
- Sanitary fittings where applicable
- Additional glazing
- Branding and colour options
- Access and security options
- Transport and placement scope
Typical applications
Worksite facilities
The configuration is selected around the intended use, destination and project requirements.
Changing rooms
The configuration is selected around the intended use, destination and project requirements.
Event facilities
The configuration is selected around the intended use, destination and project requirements.
Leisure facilities
The configuration is selected around the intended use, destination and project requirements.
Sanitary container projects are configured around their intended use, location and required functions. The room layout, selected options and technical scope are agreed before the order.
NSS Container provides an individual offer that confirms the selected configuration, project assumptions, price and schedule. Transport and placement can be quoted according to the route and site conditions.
Planning a sanitary container
A sanitary container is planned from the number of users and the peak times: how many people use it at once, which fittings they need and whether it runs in winter. Typical uses are worksite facilities, changing rooms, events and leisure facilities. Say whether men and women need separate areas and whether the facilities must be accessible.
Water supply, drainage and electricity have to reach the container on site; utility connections are organised locally unless the offer states otherwise. In wet rooms, surfaces must resist moisture and be easy to clean, and ventilation and heating belong in the brief. If changing groups use the container, for example on a construction site, plan enough hot water for peak times. The fittings, their number and the finishes are agreed in the quote.
What to include in a sanitary brief
- Number of users and peak use
- WCs, washbasins, showers and changing area
- Hot water and winter operation
- Water, drainage and power connection at the site
- Ventilation and heating
- Floor and wall finishes for wet rooms
Configuration, equipment, price and schedule are confirmed in your individual offer.
What your offer clarifies
The final scope is confirmed before the order.
Selected configuration and fittings
Transport and placement scope, if requested
Project assumptions and exclusions
Confirmed price and schedule
Product questions
Which configuration is available?+
Available dimensions, layout and fittings are selected for the intended use and confirmed in the individual offer.
How long does realisation take?+
Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule is confirmed in the offer.
Is transport included?+
Transport and placement are included only when explicitly confirmed and priced in the individual offer.
Do I need a permit?+
Requirements depend on the location and intended use. Confirm them with the relevant local authority before ordering.
Turn your idea into a clear project brief
Send the essentials. We will respond with the right questions and an individual next step.




