The short answer
In Germany there is no single national answer, because each federal state has its own building code (Landesbauordnung). In Bavaria, for example, erecting, altering or changing the use of a structure requires a building permit unless the code provides otherwise (Art. 55 BayBO), and even projects without a permit procedure must meet all public-law requirements. Ask the local building authority before you order.
Why a container counts as a building
A container that is meant to stay in one place is not treated like a vehicle. The Bavarian code, for example, treats structures intended to be used predominantly in one place as building structures (Art. 2 BayBO). Rooms intended for people to stay in for more than a short time are called Aufenthaltsräume, which matters for offices and living space.
Projects without a permit procedure: an example from Bavaria
Each state code lists projects that need no permit procedure. In Bavaria (text in force from 1 May 2026) the list includes buildings with a gross volume of up to 75 m³, except in the so-called Außenbereich, and temporarily placed site facilities, including site accommodation (Art. 57 BayBO). Other states set different limits. Whether your plot lies in the Außenbereich, and how the gross volume of your configuration is calculated, is best confirmed with the authority.
No procedure does not mean no rules
Exemption from the permit procedure does not release you from the requirements of public law, and the building authority keeps its powers to intervene (Art. 55 (2) BayBO). Rules on land use, distances or fire safety, for example, still have to be met.
Questions for the local authority
- •Is the intended use allowed on this plot?
- •Does the plot lie in the Außenbereich or within a development plan?
- •Which procedure applies: none, a notification or a permit application?
- •Which drawings and technical documents are required?
- •Which rules on distances, utility connections and fire safety apply?
- •Who may submit and sign the drawings and documents?
- •Can the project be ordered before the approval is granted?
A sensible order of steps
- •Clarify the use and the status of the plot with the authority
- •Choose a configuration and request an offer with dimensions and layout, which you need for the gross volume and the drawings
- •Submit the notification or application locally, if one is required
- •Confirm the order once the permit route is clear
- •Prepare foundation, access and utility connections before the delivery date
For the authority you will usually need the external dimensions, the layout and a description of the construction. Which drawings and documents we provide is agreed for each project and stated in the offer.
Outside Germany
Other countries have their own building rules. The same questions work there; ask them at the authority responsible for the plot.
Confirm responsibilities in the offer
Unless the offer states otherwise, local permits and approvals, foundation and utility connections are organised on the customer side. Agree which drawings and documents are part of our offer and which are prepared locally by you or appointed specialists. Realisation starts from a minimum of 6 weeks after order confirmation, so allow time for the permit before you confirm the order.
This guide is general information, not legal advice. Status of the linked legal texts: October 2026. See also: modular building buying guide.
Send your intended use, destination and key requirements for an individual quote.
How long does realisation take?+
Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule is confirmed in the individual offer.
Is transport included?+
Transport and placement are included only when explicitly confirmed and priced in the individual offer.
Do I need a permit?+
Requirements depend on the location and intended use. Confirm them with the relevant local authority before ordering.