How to Compare Residential Container Offers

    Compare the scope, assumptions and responsibilities before deciding.

    How to Compare Residential Container Offers

    The short answer

    Compare residential container offers line by line, not by photo or headline. Check the module size and layout, the wall and floor build-up, the installations, what transport and unloading include, what you must prepare on site, and the schedule. An offer that leaves these points open is not cheaper; it is only less complete.

    What buying from Poland means with NSS Container

    NSS Container is based in Rzeszów, Poland, and is your single contact from the first enquiry to delivery. You receive one written offer for your configuration. We only sell; we do not offer containers for hire. Realisation starts from a minimum of 6 weeks after order confirmation, and the exact schedule is confirmed in the offer.

    Line-by-line comparison

    What to compareWhat to check in the offerExample from our offer
    Size and layoutExternal dimensions, number of modules, roomsModules of 6 × 3 m or 7 × 3 m; a house of two 6 × 3 m modules with two bedrooms
    Walls, roof, floorInsulation material and thickness, floor build-up100 mm PIR panels in walls and roof; floor insulated with PIR, 18 mm OSB board, waterproof PVC flooring
    Electrical installationSockets, lighting, fuse box, external socketCabling, sockets, LED lighting, fuse box and external socket
    Heating and coolingWhat heats the rooms in winterOption: air conditioner of 3.5 kW for heating and cooling; underfloor heating in the two-module house
    Bathroom and kitchenWhich fittings are includedBathroom and kitchenette with induction hob, sink and fridge (two-module house)
    Windows and doorsSizes, opening type, shadingTilt-and-turn windows of 1000 × 2000 mm with external roller shutters (two-module house)
    Transport and unloadingIncluded, on your side or still to be confirmedQuoted per route; unloading agreed in the quote
    Not included unless statedWhat you organise locallyFoundation, utility connections, local permits, earthworks
    ScheduleStart and conditionsFrom a minimum of 6 weeks after order confirmation

    Delivery to Germany: an oversize transport

    A 3 m wide module exceeds the 2.55 m maximum width for a vehicle and its load in Germany (§ 22 StVO), so it travels as an oversize transport with a permit (§ 29 (3) StVO). Route, permit conditions and unloading influence the transport cost, which is why it is quoted for your address. The site needs access for a truck with a crane and a prepared placement area.

    Questions to ask before ordering

    • •Which use is the offer based on: all-year living, guests or staff?
    • •Which fittings and finishes are included, and which are options?
    • •What must be prepared at the destination: foundation, access, connections?
    • •Are transport, unloading and, for several modules, assembly on site included?
    • •Which documents are part of the offer?
    • •Until when is the offer valid, and what are the payment and warranty terms?

    Local requirements come first

    Residential use raises questions about building law, utility connections and technical requirements. Clarify them with the local building authority and local specialists before you order; our permit guide shows where to start. Tax questions, for example VAT on a purchase from another EU country, are best clarified with your tax adviser.

    See also: residential containers and what shapes the cost of a container project.

    Send your intended use, destination and key requirements for an individual quote.

    How long does realisation take?+

    Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule is confirmed in the individual offer.

    Is transport included?+

    Transport and placement are included only when explicitly confirmed and priced in the individual offer.

    Do I need a permit?+

    Requirements depend on the location and intended use. Confirm them with the relevant local authority before ordering.

    Planning a container project?

    Send the intended use, destination and key requirements for an individual next step.

    Request a project quote

    Turn your idea into a clear project brief

    Send the essentials. We will respond with the right questions and an individual next step.

    Individual response Sale only

    Realisation starts from a minimum of 6 weeks after order confirmation. The exact schedule depends on configuration, scope and destination and is confirmed in the offer.

    Request a project quote